Summer Peak Hours: 3-6 p.m. (Apr. – Oct.)

Commercial Solar

Commercial Solar Requirements

  1. Completed Interconnection Agreement Application
    • Proposed kW system size (includes both AC and DC output ratings)
    • Proposed battery size (in kWh) listed, if applicable
  2. Single line diagram of proposed system installation
    • Include all proposed equipment
    • Include member’s existing meter base and electrical panels
  3. Proof of a minimum of $100,000 personal liability insurance carried by the homeowner for the property on the application
  4. $250 Interconnection Application Fee paid to Horry Electric
    • Payments accepted via cash, check or credit/debit card by phone at (843) 369-2211
  5. Solar Rate Agreement form
  6. Installation Authorization Release and Waiver of Liability form

Click here to begin the application process

IMPORTANT REMINDER
Winter peak hours begin November 1. Peak hours will be from 6 - 9 a.m. (November 1 - March 31). Click below to learn more about rates and peak hours.